Milltown GAA Sports Ground Solutions was engaged by Milltown Gaa for a sports capital grant and leader funded project to: Design, Tender and Engage a professional pith contractor to carry out works on this ambitious 2 x platform pitches on 6 acres of land overlooking the...

Galway Racecourse DAR Golf have been providing drainage services to Galway Racecourse since 2012. The drainage system plays a critical role in maintaining a consistent racing surface which helps to keep racing going and ensure the safety of both the horses and their riders.  Our most...

Naas Racecourse The first two furlongs of the straight course had the reputation of being one of worst starts in Irish Horse Racing due to the undulations present.Following on from a preliminary level survey of the area, I contacted James D’Arcy of DAR Golf Construction. What...

Cork Racecourse Mallow Extension, Re-grade, Primary Pipe Drainage System, and Surface Establishment of the Straight Course at Cork Racecourse Mallow.Project outline:I) Extend the straight course into the adjoining field and extend the wooden rail fencing.II) Straight course, top soil strip sub-soil grade and top soil return...

Rathdowney GAA Rathdowney Gaa and the grounds committee lead by Justin Kavanagh set out on an ambitious 2 new pitches and training area, over 30,000 sq.m project. Sports Ground Solutions was engaged to design and project manage this sports capital project. DAR Golf competitive pricing and excellent...

Ballyboden St. Enda's GAA 2017-2018 Job Summary: • Preliminary items • Site Preparation • Cut and Fill grading • Topsoil placement • Drainage infrastructure and primary drainage • Profile development, sanding and secondary drainage • Final surface seeding, finishing and fertilising • Upgrading of localised areas to gravel raft and synthtietc turf • Goalposts and Dugouts •...

Grange Golf Course “I have been working with DAR Golf Ltd (DAR) over the past 3 years on the Master Plan at Grange Golf Club, Rathfarnham, Dublin.During this time DAR have built a new chipping area, putting greens and the redevelopment of the 1st hole, par...

The Island Golf Course The overall goal of the project was to make an improvement to the front 9 holes of The Island Golf Club, focusing on the 3rd, 4th, 5th, 6th, 8th and 9th holes. This included: Hole 3 Extension of fairway back towards the tees. Addition of...

Castlebar Golf Course 32 Month Contract at Castlebar Golf Club.Hole 1A new green and approach area was designed for this hole.Hole 3A couple of new tees were built.A new green and approach complex was built beyond the location of the old green site.Hole 4New tees were...

Dun Laoghaire Golf Course 2017 In 2017, we commissioned DAR Golf to construct a new 7th hole at Dun Laoghaire Golf Club. The Club’s brief was for a spectacular Par 3 golf hole with a water feature.The basics of the design were relatively straight-forward in that it comprised...